Posted on March 26, 2009 in Tractor Machine & Equipment by Ben Tan

This is simply because one can not keep up with the powered CEB machine’s demand for dirt, so one person can make only 1/2 brick per minute on average on a continuous, 8-hour day basis if one has to shovel buckets of dirt manually. That ’s a whole major piece of additional edquipment, so why not just increase the hopper size and load with a tractor, which is already part of the equipment base? We are now going to the tractor-loaded version with a large hopper for the